Primetime Constructionpoolhouse construction

Was supposed to stay on site daily until job was completed. Starting in December, he began showing up less and less. Now, we see him about 2-3 hours per week. The job is still about 90% done and hasn't changed much in months. On March 8th, he said there was only a week of work left. It has been so long that he forgot most of what I told him to do so what little work he's doing is wrong. The walls were closed with wires not pulled so he put a hole in the ceiling and left the wire hanging. Bottom line, he no longer answers my calls or texts and the job remains incomplete.

Sc
Jun 04, 2018